The challenge of choosing the right method for surveying power cables

The rising number of wind parks, and thus the demand for new survey tasks, results in continuous development for companies working in the renewable energy sector. Building a wind park requires laying inter-array and export cables. Those cables are buried or covered to protect them, bringing environmental changes to a minimum. A common depth of burial ranges from 1.5 m to 3 m. The challenge of surveying those buried power cables is choosing the right method.

cable tracking | depth of burial | HVAC/HVDC | survey power cables

  • Ausgabe: HN 105 Seite: 47–49
  • DOI: 10.23784/HN105-10
  • Autor/en: Oliver Anders

Sorry, this website uses features that your browser doesn’t support. Upgrade to a newer version of Firefox, Chrome, Safari, or Edge and you’ll be all set.

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.